Effect of lean processes on surgical wait times& efficiency in a tertiary care veterans affairs medical center

Nakul P. Valsangkar, Andrew Eppstein, Rick A. Lawson, Amber N. Taylor

Research output: Contribution to journalArticle

7 Citations (Scopus)

Abstract

IMPORTANCE There are an increasing number of veterans in the United States, and the current delay and wait times prevent Veterans Affairs institutions from fully meeting the needs of current and former service members. Concrete strategies to improve throughput at these facilities have been sparse. OBJECTIVE To identify whether lean processes can be used to improve wait times for surgical procedures in Veterans Affairs hospitals. DESIGN, SETTING, AND PARTICIPANTS Databases in the Veterans Integrated Service Network 11 DataWarehouse, Veterans Health Administration Support Service Center, and Veterans Information Systems and Technology Architecture/Dynamic Host Configuration Protocol were queried to assess changes in wait times for elective general surgical procedures and clinical volume before, during, and after implementation of lean processes over 3 fiscal years (FYs) at a tertiary care Veterans Affairs medical center. All patients evaluated by the general surgery department through outpatient clinics, clinical video teleconferencing, and e-consultations from October 2011 through September 2014 were included. Patients evaluated through the emergency department or as inpatient consults were excluded. EXPOSURES The surgery service and systems redesign service held a value stream analysis in FY 2013, culminating in multiple rapid process improvement workshops. Multidisciplinary teams identified systemic inefficiencies and strategies to improve interdepartmental and patient communication to reduce canceled consultations and cases, diagnostic rework, and no-shows. High-priority triage with enhanced operating room flexibility was instituted to reduce scheduling wait times. General surgery department pilot projects were then implemented mid-FY 2013. MAIN OUTCOMES AND MEASURES Planned outcome measures includedwait time, clinic and telehealth volume, number of no-shows, and operative volume. Paired t tests were used to identify differences in outcome measures after the institution of reforms. RESULTS Following rapid process improvement workshop project rollouts, mean (SD) patient wait times for elective general surgical procedures decreased from 33.4 (8.3) days in FY 2012 to 26.0 (9.5) days in FY 2013 (P = .02). In FY 2014, mean (SD) wait times were half the value of the previous FY at 12.0 (2.1) days (P = .07). This was a 3-fold decrease from wait times in FY 2012 (P = .02). Operative volume increased from 931 patients in FY 2012 to 1090 in FY 2013 and 1072 in FY 2014. Combined clinic, telehealth, and e-consultation encounters increased from 3131 in FY 2012 to 3460 in FY 2013 and 3517 in FY 2014, while the number of no-shows decreased from 366 in FY 2012 to 227 in FY 2014 (P = .02). CONCLUSIONS AND RELEVANCE Improvement in the overall surgical patient experience can stem from multidisciplinary collaboration among systems redesign personnel, clinicians, and surgical staff to reduce systemic inefficiencies. Monitoring and follow-up of system efficiency measures and the employment of lean practices and process improvements can have positive short-And long-Term effects on wait times, clinical throughput, and patient care and satisfaction.

Original languageEnglish (US)
Pages (from-to)42-47
Number of pages6
JournalJAMA Surgery
Volume152
Issue number1
DOIs
StatePublished - Jan 1 2017

Fingerprint

Veterans
Tertiary Healthcare
Elective Surgical Procedures
Referral and Consultation
Telemedicine
Outcome Assessment (Health Care)
Veterans Health
Veterans Hospitals
Education
United States Department of Veterans Affairs
Triage
Operating Rooms
Ambulatory Care Facilities
Patient Satisfaction
Information Systems
Hospital Emergency Service
Inpatients
Patient Care
Communication
Databases

ASJC Scopus subject areas

  • Surgery

Cite this

Effect of lean processes on surgical wait times& efficiency in a tertiary care veterans affairs medical center. / Valsangkar, Nakul P.; Eppstein, Andrew; Lawson, Rick A.; Taylor, Amber N.

In: JAMA Surgery, Vol. 152, No. 1, 01.01.2017, p. 42-47.

Research output: Contribution to journalArticle

Valsangkar, Nakul P. ; Eppstein, Andrew ; Lawson, Rick A. ; Taylor, Amber N. / Effect of lean processes on surgical wait times& efficiency in a tertiary care veterans affairs medical center. In: JAMA Surgery. 2017 ; Vol. 152, No. 1. pp. 42-47.
@article{6bb1a99a6368420ea1c9368df1e517ec,
title = "Effect of lean processes on surgical wait times& efficiency in a tertiary care veterans affairs medical center",
abstract = "IMPORTANCE There are an increasing number of veterans in the United States, and the current delay and wait times prevent Veterans Affairs institutions from fully meeting the needs of current and former service members. Concrete strategies to improve throughput at these facilities have been sparse. OBJECTIVE To identify whether lean processes can be used to improve wait times for surgical procedures in Veterans Affairs hospitals. DESIGN, SETTING, AND PARTICIPANTS Databases in the Veterans Integrated Service Network 11 DataWarehouse, Veterans Health Administration Support Service Center, and Veterans Information Systems and Technology Architecture/Dynamic Host Configuration Protocol were queried to assess changes in wait times for elective general surgical procedures and clinical volume before, during, and after implementation of lean processes over 3 fiscal years (FYs) at a tertiary care Veterans Affairs medical center. All patients evaluated by the general surgery department through outpatient clinics, clinical video teleconferencing, and e-consultations from October 2011 through September 2014 were included. Patients evaluated through the emergency department or as inpatient consults were excluded. EXPOSURES The surgery service and systems redesign service held a value stream analysis in FY 2013, culminating in multiple rapid process improvement workshops. Multidisciplinary teams identified systemic inefficiencies and strategies to improve interdepartmental and patient communication to reduce canceled consultations and cases, diagnostic rework, and no-shows. High-priority triage with enhanced operating room flexibility was instituted to reduce scheduling wait times. General surgery department pilot projects were then implemented mid-FY 2013. MAIN OUTCOMES AND MEASURES Planned outcome measures includedwait time, clinic and telehealth volume, number of no-shows, and operative volume. Paired t tests were used to identify differences in outcome measures after the institution of reforms. RESULTS Following rapid process improvement workshop project rollouts, mean (SD) patient wait times for elective general surgical procedures decreased from 33.4 (8.3) days in FY 2012 to 26.0 (9.5) days in FY 2013 (P = .02). In FY 2014, mean (SD) wait times were half the value of the previous FY at 12.0 (2.1) days (P = .07). This was a 3-fold decrease from wait times in FY 2012 (P = .02). Operative volume increased from 931 patients in FY 2012 to 1090 in FY 2013 and 1072 in FY 2014. Combined clinic, telehealth, and e-consultation encounters increased from 3131 in FY 2012 to 3460 in FY 2013 and 3517 in FY 2014, while the number of no-shows decreased from 366 in FY 2012 to 227 in FY 2014 (P = .02). CONCLUSIONS AND RELEVANCE Improvement in the overall surgical patient experience can stem from multidisciplinary collaboration among systems redesign personnel, clinicians, and surgical staff to reduce systemic inefficiencies. Monitoring and follow-up of system efficiency measures and the employment of lean practices and process improvements can have positive short-And long-Term effects on wait times, clinical throughput, and patient care and satisfaction.",
author = "Valsangkar, {Nakul P.} and Andrew Eppstein and Lawson, {Rick A.} and Taylor, {Amber N.}",
year = "2017",
month = "1",
day = "1",
doi = "10.1001/jamasurg.2016.2808",
language = "English (US)",
volume = "152",
pages = "42--47",
journal = "JAMA Surgery",
issn = "2168-6254",
publisher = "American Medical Association",
number = "1",

}

TY - JOUR

T1 - Effect of lean processes on surgical wait times& efficiency in a tertiary care veterans affairs medical center

AU - Valsangkar, Nakul P.

AU - Eppstein, Andrew

AU - Lawson, Rick A.

AU - Taylor, Amber N.

PY - 2017/1/1

Y1 - 2017/1/1

N2 - IMPORTANCE There are an increasing number of veterans in the United States, and the current delay and wait times prevent Veterans Affairs institutions from fully meeting the needs of current and former service members. Concrete strategies to improve throughput at these facilities have been sparse. OBJECTIVE To identify whether lean processes can be used to improve wait times for surgical procedures in Veterans Affairs hospitals. DESIGN, SETTING, AND PARTICIPANTS Databases in the Veterans Integrated Service Network 11 DataWarehouse, Veterans Health Administration Support Service Center, and Veterans Information Systems and Technology Architecture/Dynamic Host Configuration Protocol were queried to assess changes in wait times for elective general surgical procedures and clinical volume before, during, and after implementation of lean processes over 3 fiscal years (FYs) at a tertiary care Veterans Affairs medical center. All patients evaluated by the general surgery department through outpatient clinics, clinical video teleconferencing, and e-consultations from October 2011 through September 2014 were included. Patients evaluated through the emergency department or as inpatient consults were excluded. EXPOSURES The surgery service and systems redesign service held a value stream analysis in FY 2013, culminating in multiple rapid process improvement workshops. Multidisciplinary teams identified systemic inefficiencies and strategies to improve interdepartmental and patient communication to reduce canceled consultations and cases, diagnostic rework, and no-shows. High-priority triage with enhanced operating room flexibility was instituted to reduce scheduling wait times. General surgery department pilot projects were then implemented mid-FY 2013. MAIN OUTCOMES AND MEASURES Planned outcome measures includedwait time, clinic and telehealth volume, number of no-shows, and operative volume. Paired t tests were used to identify differences in outcome measures after the institution of reforms. RESULTS Following rapid process improvement workshop project rollouts, mean (SD) patient wait times for elective general surgical procedures decreased from 33.4 (8.3) days in FY 2012 to 26.0 (9.5) days in FY 2013 (P = .02). In FY 2014, mean (SD) wait times were half the value of the previous FY at 12.0 (2.1) days (P = .07). This was a 3-fold decrease from wait times in FY 2012 (P = .02). Operative volume increased from 931 patients in FY 2012 to 1090 in FY 2013 and 1072 in FY 2014. Combined clinic, telehealth, and e-consultation encounters increased from 3131 in FY 2012 to 3460 in FY 2013 and 3517 in FY 2014, while the number of no-shows decreased from 366 in FY 2012 to 227 in FY 2014 (P = .02). CONCLUSIONS AND RELEVANCE Improvement in the overall surgical patient experience can stem from multidisciplinary collaboration among systems redesign personnel, clinicians, and surgical staff to reduce systemic inefficiencies. Monitoring and follow-up of system efficiency measures and the employment of lean practices and process improvements can have positive short-And long-Term effects on wait times, clinical throughput, and patient care and satisfaction.

AB - IMPORTANCE There are an increasing number of veterans in the United States, and the current delay and wait times prevent Veterans Affairs institutions from fully meeting the needs of current and former service members. Concrete strategies to improve throughput at these facilities have been sparse. OBJECTIVE To identify whether lean processes can be used to improve wait times for surgical procedures in Veterans Affairs hospitals. DESIGN, SETTING, AND PARTICIPANTS Databases in the Veterans Integrated Service Network 11 DataWarehouse, Veterans Health Administration Support Service Center, and Veterans Information Systems and Technology Architecture/Dynamic Host Configuration Protocol were queried to assess changes in wait times for elective general surgical procedures and clinical volume before, during, and after implementation of lean processes over 3 fiscal years (FYs) at a tertiary care Veterans Affairs medical center. All patients evaluated by the general surgery department through outpatient clinics, clinical video teleconferencing, and e-consultations from October 2011 through September 2014 were included. Patients evaluated through the emergency department or as inpatient consults were excluded. EXPOSURES The surgery service and systems redesign service held a value stream analysis in FY 2013, culminating in multiple rapid process improvement workshops. Multidisciplinary teams identified systemic inefficiencies and strategies to improve interdepartmental and patient communication to reduce canceled consultations and cases, diagnostic rework, and no-shows. High-priority triage with enhanced operating room flexibility was instituted to reduce scheduling wait times. General surgery department pilot projects were then implemented mid-FY 2013. MAIN OUTCOMES AND MEASURES Planned outcome measures includedwait time, clinic and telehealth volume, number of no-shows, and operative volume. Paired t tests were used to identify differences in outcome measures after the institution of reforms. RESULTS Following rapid process improvement workshop project rollouts, mean (SD) patient wait times for elective general surgical procedures decreased from 33.4 (8.3) days in FY 2012 to 26.0 (9.5) days in FY 2013 (P = .02). In FY 2014, mean (SD) wait times were half the value of the previous FY at 12.0 (2.1) days (P = .07). This was a 3-fold decrease from wait times in FY 2012 (P = .02). Operative volume increased from 931 patients in FY 2012 to 1090 in FY 2013 and 1072 in FY 2014. Combined clinic, telehealth, and e-consultation encounters increased from 3131 in FY 2012 to 3460 in FY 2013 and 3517 in FY 2014, while the number of no-shows decreased from 366 in FY 2012 to 227 in FY 2014 (P = .02). CONCLUSIONS AND RELEVANCE Improvement in the overall surgical patient experience can stem from multidisciplinary collaboration among systems redesign personnel, clinicians, and surgical staff to reduce systemic inefficiencies. Monitoring and follow-up of system efficiency measures and the employment of lean practices and process improvements can have positive short-And long-Term effects on wait times, clinical throughput, and patient care and satisfaction.

UR - http://www.scopus.com/inward/record.url?scp=85012864980&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85012864980&partnerID=8YFLogxK

U2 - 10.1001/jamasurg.2016.2808

DO - 10.1001/jamasurg.2016.2808

M3 - Article

C2 - 27603225

AN - SCOPUS:85012864980

VL - 152

SP - 42

EP - 47

JO - JAMA Surgery

JF - JAMA Surgery

SN - 2168-6254

IS - 1

ER -